Hello Larkey neighbors. Interested in improving safety issues on 2nd Ave? There’s a community meeting hosted by the City of Walnut Creek coming up Monday November 29 at 5 pm that we want to make you aware of.
TOPICS:
PEDESTRIAN & BIKE IMPROVEMENTS
REVIEW PREVIOUSLY DISCUSSED TRAFFIC ISSUES
TRAFFIC ENGINEERING SOLUTIONS, TRADE-OFFS & CONSTRAINTS
There are signs posted on poles on 2nd Ave, but the date on some of the signs is wrong! This meeting is via Zoom. Monday, November 29 from 5 PM to 6:30 PM
MEETING ID: 832 5645 8378
PASSCODE: 2032
Here are some comments your neighbors have already submitted to the traffic engineers. If you'd like to add to these, please email dutytraffic@walnut-creek.org and CC larkeyparkneighborsunited@gmail.com There is a pedestrian walkway being proposed down 2nd Ave.
How will a straight line be made for the walkway on a jagged 2nd Ave
Which side of the road (north or south side) is best suited for the pedestrian walkway?
How can you ensure it’s a pedestrian-only walkway?
Can “sharrows” be used to encourage experienced cyclists to ride in the middle of the road?
Can you provide an example of a pedestrian walkway elsewhere?
Will the walkway be protected? ex: raised bumps, flexible stanchion, other
Will there be any construction? If so, what?
Once started, how long will the pedestrian walkway and other improvements take to complete?
Is there a method to limit speeding on 2nd Ave? ex: painted roadway MPH limit, Solar Radar Speed Sign, share the road signs, speed humps, other?
Point your phone camera at the code at 5 pm on Monday to get the link.
Or join us using this info.
MEETING ID: 832 5645 8378
PASSCODE: 2032
Comentários